Content Row
Los Altos School District, ForeFront Power, Sunworks and TerraVerde Energy celebrated the completion of solar canopy systems across the District's nine schools at a ribbon cutting ceremony at Oak School on May 24. At the time of the ceremony, the 1.4-megawatt (MW) solar project had already produced an energy savings of just over $25,000 for the district. It is expected that LASD will save $175,000 annually, and up to $2.7 million in the first 10 years.
Click here to read the full press release about solar energy at LASD.
11/13/24 11:07 PM
Session for has timed out.
Logging in as the above user will re-enable all open tabs and allow you to continue editing.
Name | Graduation Year | Phone Number |
---|
First Name | Last Name | Phone Number |
---|
You are about to delete . Are you sure you want to perform this action?
This action cannot be undone.
# | Album Name | Owner | Location | Description | Images |